GASSTROYMONTAJ
home
about us
history
activities
gas pipeline construction and related activities
general information
pipeline equipment
projects
gas and heat-transfer pipelines in bulgaria
gas and oil pipelines abroad
natural gas cs, mrs, ms, rs
gas distribution pipeline projects
construction of water pipelines and sewage systems
general information
pipeline equipment
projects
construction of waste water and potable water treatment plants
general information
projects
construction and reconstruction of buildings
general information
projects
execution of piles and anchors
general information
equipment
projects
geothermal drilling and heating
general information
equipment
road construction
general information
machinery rental in the country and abroad
pipeline equipment
drilling rigs for piles, anchors, geothermal drillings
general type construction equipment
vehicles for transport services
other activities
general information
projects
membership
certificates
company’s structure
projects
recent projects
gas and heat-transfer pipeline construction and related activities
gas and heat-transfer pipelines in bulgaria
gas and oil pipelines abroad
natural gas cs, mrs, ms, rs
gas distribution pipeline projects
execution of piles and anchors
water treatment plants
water and sewage pipelines
construction and reconstruction of buildings
other projects
equipment
general information
pipeline equipment
drilling rigs for piles, anchors, geothermal drillings
general type construction equipment
vehicles for transport services
ndt equipment
ndt and corrosion protection labs
group of companies
news
contacts
execution of Piles and Anchors
Project
Client
Year
Drilling of of piles – 70pcs., dia. 800mm, unit depth 5m, total length 350m. Under Project: Emergency earth stabilization of 4th railway line from km 201+070 to km 201+120 in the section between railway station Krastetz and railway station Raduntsi
“Ka Build BG” LTD
14.09.2015 09.10.2015
Drilling of of piles – 60pcs., dia. 800mm, unit depth 10m, total length 600m. Under Project: Earth stabilization of the right side of the 5th railway line from km 5+943 to km 6+008 by supporting piling wall with length 72m in the section between railway station Zaharna Fabrika and railway station Gorna Banya
“DV Stroy Consult” LTD
16.07.2015 25.07.2015
Drilling of of piles – 128pcs., dia. 800mm, unit depth 15m, total length 1920m. Under Project: Sewage Pump Station (SPS) 1, pressure pipeline from SPS 1, SPS 2 and pressure pipeline from SPS 2 to Project: “Construction of WWTp Silistra”
Crystal Water AD
10.03.2014 03.10.2015
Drilling and Casting in-situ of piles OD800mm, total length 2280m in the distance between the railway stations Smiadovo-Komunari on the 26th railway line Shumen - Komunari
Kram Complex Company LTD
28.03.2014 23.05.2014
Stabilization of roads in Gorna Oriahovitsa region, incl. implementation of cast in-situ piles with OD800mm, total length: 726.10m
Enel Stroy Ltd.
18.10.2013 20.11.2013
Stabilization of railway road Veliko-Tarnovo-Samovodene by: • drilling and casting in-situ of piles dia. 800mm, unit depth 11m – 130pcs, total length – 1430m.
„Geosonda Service –Kolev” LTD
12.2012 01.2013
Emergency earth stabilization of landslide at km 379+000 at main road E-85 (1-5) Kardzhali-Cross Border Point Makaza
TRACE Kardzhali JSC
13.10.2011 21.12.2011
Landslide stabilization and reconstruction of road section of Road III-376 Prevala-Rakitovo-Kostandovo km 10+100
Eko - Hidro 90 LTD
10.02.2011 15.04.2011
Landslide stabilization of road IV - 16061 village Rebrovo - Yablanitsa
Geolobby - Kiril Angelov SP
08.12.2010 13.12.2010
Stabilization of crossings of gas pipeline branches from Bulgartransgaz transmission system in operational area of Valchi dol
Bulgartransgaz EAD
2010-2011