Compressor station “Strandja” – Extension with one turbo compressor (10.27 MW)

Client: Bulgargaz EAD
Period: 2001-2002
Description:

Strandja Compressor Station is located near Bulgarian-Turkish border and is a part from the crossing Bulgaria transit natural gas pipeline to Turkey.
Through the extension the natural gas transit to Turkey extends to 18 bcm per year.
The total power of the Compressor Station is 32 MW.
“Gasstroymontaj” JSC executed 52 sub-sites, more important from them are as follows:

  • New compressor unit installation (10.27 MW);
  • Gas cleaning and gas cooling equipment;
  • Starting and combustible gas equipment;
  • Replacement of HV power line, 20 kV;
  •  Reconstruction and modernization of production and administration units;
  • Construction of new fire prevention reservoir and pump station, fire alarm and fire   extinguishing systems;
  •  Construction of local WWTP;
  •  Water  pipeline and site sewerage, outer sewerage.

All construction and installation works were executed while the station was in operation.